TECHNICAL ASESSMENT OF AIN GHAZAL PRE-TREATMENT
PLANT EXPANSION REQUIREMENTS

 

BACKGROUND
PROJECT OBJECTIVES
CURRENT STATUS
  • Confirm the long-term operational capacity of the original siphon, new conveyor, and Ain Ghazal pretreatment plant and provide preliminary design recommendations for expansion of the pretreatment system by 2005 to meet the technical requirements of the RFP for the proposed As Samra BOT contract;
  • Conduct a technical inspection and assessment of the existing Ain Ghazal facilities to establish if cost effective measures can and should be undertaken to pretreat septic sewage at Ain Ghazal with refurbishment, modification and use of existing facilities; and
  • Provide recommendations for possible additional cost effective improvements at Ain Ghazal which would benefit MWI under the terms of the proposed 25 yr BOT contract.